Call 1917 or 26594500/ 61564500

Mahanagar Gas

HomeCustomer ZoneCustomer CarePolicies & Procedures

Service Charges

After Sales Rate (Labour rates) for job inside the customer's premises effective from 15th May, 2017 (This service is available from 10 AM to 6 PM on all days except Sundays and Holidays)

  • Sr. No. Activity UoM Amount (Rs.)
  • 1 Removal of Meter without alteration  Each 280
  • 2 Installation of Meter without alteration Each 350
  • 3 Addition / Alteration of Copper Tubing in addition to job done in SR No 2 Meter  65
  • 4 Addition / Alteration of GI Pipe   Meter  120
  • 5 Only Copper Pipe Work (upto 5 meter) No  500
  • 6 Removal of Hole piece without alteration Each 350
  • 7 Installation of Hole piece without alteration Each 350
  • 8 Temporary Disconnection Each 200
  • 9 Reconnection (of Temporary Disconnected cases only) Each 225
  • 10 Fixing of PVC Clamps only Each 175
  • 11 Inspection of MGL installation Each 250
  • 12 Meter replacement work  Each 400
  • 13 Visit charge applicable on second visit/ techical support request from customer/leakage in case of meter checking  Each 150
  • 14 Installation/replacement of appliance valve Each 200
  • 15 Installation/replacement of meter brackets Each 300
  • 16 Meter checking (In case if meter is found OK) Each 550
  • 17 Painting of GI riser & laterals. Mtr 95
  • 18 Riser testing,leakage rectification & clamping of riser. Each 50
  • 19 Shifting of Service regulator upto 3 meter Each 3000
  • 20.a Laying of 32/63 mm PE pipeline without reinstatement Mtr  500
  • 20.b Laying of 32/63 mm PE pipeline with reinstatement Mtr 900
  • 21 Installation of welded riser  Mtr  350
  • 22 Installation of Half round concrete guard - labour charges Each 150
  • 23 GI riser work upto 4 meters for customer connectivity upto MCV including presleeved hole piece Each 1200
  • 24 Replacement of Riser isolation valve Each 250
  • Note: Service tax will be applicable extra

Schedule of rates for attending stove burner and rubber tube requests

  • Sr. No. Activity Unit Amount (Rs.)
  • 1 Suraksha Tube (1.5 Mtrs.) Each 190
  • 2 Visit Charges Each 75
  • 3 Hot plate service charges Per hot plate 70
  • 4 Hot plate services
  • 4. a. Knob change Each 12
  • 4. b. Jet replacement Each 12
  • 4. c. Nut/ bolt/ screw Each 12
  • 4. d. Spring change Each 8
  • 4. e. Lock pin change Each 8
  • 4. f. Gas cock Each 180
  • 4. g. Small burner with brass top Each 170
  • 4. h. Big burner with brass top Each 215
  • 4. i. Side change Each 60
  • 4. j. Nipple Each 30
  • 4. k. Pan support (Cast iron) Each 90
  • 4. l. SS Burner tray Each 65
  • 4. m. Brass burner top (Small) Each 110
  • 4. n. Brass burner top (Big) Each 120
  • 4. o. Rubber legs Each 25
  • 4. p. PVC legs Each 25
  • 4. q. Clip charges Each 12
  • 4.r. Spindle Each 42
  • 4.s. Nozzle Each 110
  • 5. Cooking range and 4 burner services Per cooking range 300
  • 6. Stove conversion (LPG to PNG and PNG to LPG)
  • 6. a. Stove with 2 burners Per stove 150
  • 6. b. Stove with 3/ 4 burners Per stove 250
  • 6. c. Automatic stove* Per burner 100

Note : *Conversion charges are only for services, material charges required for conversion will vary as per stove make

Material Charges effective from 15th May, 2017

  • Sr. No. Item Description Unit Rate/Unit
  • 1 Copper pipe (including fittings & consumables) Meter  230
  • 2 GI pipe  (including fittings & consumables) Meter  200
  • 3 Brass Meter inlet/ outlet union (3/4"X3/4", 3/4"X12 mm) No  131
  • 4 Brass disconnection union (1/2"X12mm,3/4"X12mm) No  109
  • 5 1/4" Valve (Appliance Valve+Brass Adapter) No  178
  • 6 1/2" Valve (MCV) No  217
  • 7 Presleeved Hole Piece  No  67
  • 8 Meter Bracket  No  46
  • 9 Alluminium saddle (clamp) with SS screw  Each 10
  • 10 Half round concrete guard Each 150

Note: For Material Rates other than mentioned above please refer MGL Material Rate List available with O&M AFS Dept.

Gas Geyser Installation Rate w.e.f. 15.05.2017

  • Sr. No. Activity UoM Present Rate / unit
  • Labour Charges
  • 1 Visit charges Each 150
  • 2 Copper pipe work up to 5 mtr. Each 500
  • 3 Copper pipe work above 5 mtr. (In addition to Sr. No. 2) Mtr 65
  • Note: Service tax will be applicable extra

    Material Charges
  • 1 Copper pipe (Including fittings & consumables) Meter 230
  • 2 1/4" Valve (Appliance Valve+Brass Adapter) No 178
  • 3 Steel Braided Suraksha Rubber Tube (Upto 1 mtr.) Each 140
  • 4 Gas Geyser cost (at actual as per bill provided to customer) Each
  • Note: For Material Rates other than mentioned above please refer MGL Material Rate List available with O&M AFS Dept.