Call 68674500 / 61564500

Mahanagar Gas

HomeCustomer ZoneCustomer CarePolicies & Procedures

Service Charges

After Sales Rate (Labour rates) for job inside the customer's premises effective from 01st June 2021 (This service is available from 10 AM to 6 PM on all days except Sundays and Holidays)

  • Labour charges for After Sales Services
  • Sr no SOR discription UOM Revised Rates wef 01.06.2021
  • 1 Removal of Meter without alteration  Each 320
  • 2 Installation of Meter without alteration Each 460
  • 3 Addition / Alteration of Copper Tubing in addition to job done in SR No 2 Meter 75
  • 4 Addition / Alteration of GI Pipe Meter 140
  • 5 Only Copper Pipe Work (upto 5 meter) Each 575
  • 6 Removal of Hole piece without alteration Each 400
  • 7 Installation of Hole piece without alteration Each 400
  • 8 Temporary Disconnection Each 230
  • 9 Reconnection (of Temporary Disconnected cases only) Each 260
  • 10 Fixing of PVC Clamps only Each 200
  • 11 Inspection of MGL installation. Each 290
  • 12 Meter repalcement work Each 460
  • 13 Visit charge applicable on second visit/ techical support request from customer Each 175
  • 14 Installation/replacement of appliance valve Each 230
  • 15 Installation/replacement of meter brackets Each 345
  • 17 Painting of GI riser & laterals. Meter 110
  • 18.A Riser testing,leakage rectification & clamping of riser.0 to 4th Floor per riser 524
  • 18.B Riser testing,leakage rectification & clamping of riser. upto 7th Floor per riser 645
  • 18.C Riser testing,leakage rectification & clamping of riser.upto 15th Floor per riser 1009
  • 18.D Riser testing,leakage rectification & clamping of riser- 15th Floor & above per riser 1970
  • 19 Shifting of Service regulator upto 3 meter Meter 3450
  • 20.a Laying of 32/63 mm PE pipeline without reinstatement Meter 575
  • 20.b Laying of 32/63 mm PE pipeline with reinstatement Meter 1035
  • 21 Installation of riser (welded) Meter 400
  • 22 Installation of Half round concrete guard - labour charges Each 175
  • 23 GI riser work upto 4 meters for customer connectivity upto MCV including presleeved hole piece Each 1380
  • 24 Replacement of Riser isolation valve Each 290
  • 25.a visit charges (Gas Geyser) Each 175
  • 25.b Copper pipe work up to 5 mtr (Gas Geyser) Each 575
  • 25.c Copper pipe work above 5 mtr (in addition to Sr No 2) (Gas Geyser) Meter 75
  • 1. CGST & SGST will be applicable extra.
    2.The cost of material is as per the MGL purchased price/rate of MGL approved vendors.
    3. 5% extra charges will be applicable on labour charges for M/s. Aarti Enterprises and D.G. Enterprises.

Schedule of rates for attending rubber tube requests

  • Sr. No. Activity Unit Amount (Rs.)
  • 1 Suraksha Rubber hose (1.5 mtrs) Each 190

Service charges to be charged by service providers for stove related services from PNG customers

In view of the changes in service charges to be levied to the customers it has been reviewed and deliberated. Accordingly, effective 01st April 2021 it has been decided that service charges to be collected by the service providers from customers for services provided will be as under:

Sr no Nature of services Unit Classification of goods/ services Charges (Rs.) GST(Rs.) Total including GST(Rs)
1 Visit charges Each Services 18% GST 100 18 118
2 Service charges for Hot plate for Per hot plate Services 18% GST 70 12.6 83
3 Service charges for Cooking range, Hobs & auto ignition Hot plates Per cooking range Services 18% GST 300 54 354
4 Stove conversion (LPG to PNG and PNG to LPG)          
4.a Stove with 2 burners Per stove Services 18% GST 150 27 177
4.b Stove with 3/4 burners Per stove Services 18% GST 250 45 295
4.c Automatic stove Per stove Services 18% GST 100 18 118

The service providers shall provide the GST invoice for any service charges collected from the customers in line with the above.

Note : The cost of material/spare parts chnaged by service provider shall be as per the model of the hot plate of the customer.